Concrete poured in the Van Gendt Hallen, a lot of concrete!
10 March 2024
As many as 27 trucks spent 8 hours pouring 350m2 of concrete in one of the five halls alone. This was immediately floated, by a machine with rotating blades that makes the concrete floor increasingly smooth and denser in texture over the course of 12 hours.
All this after months of preparation that included pile foundations, formwork, reinforcement and floor heating. The result is truly stunning!